Diagzone Xdiag Subscription Renew, LAUNCH LTR-01 RF Sensor, Thinkdiag Renew , Scania SDP3 Installation

Doosan heavy-duty machines are renowned for their exceptional performance and durability in various industries. To ensure optimal functioning, regular maintenance is crucial. One vital aspect of maintenance is the calibration of the Variable Back-Off (VBO) system, which requires a thorough pump EPPR valve check. In this article, we will guide you through the step-by-step process of conducting this essential inspection.
Preparations:
Doosan Data Monitoring System DMS-5 DMS-3 Free Download
Doosan Diagnostic Tool
Pump EPPR valve check
*Calibration judgement
3.1. Measure the input & output current of the pump EPPR valve in certain condition
Ex. DX350LC-7, Normal outputs of pump EPPR valve (Please refer the shop manual to check the exact value
on each model)
Not in operation: 300
How useful was this post?
Click on a star to rate it!
Average rating / 5. Vote count:
Please keep this link if you copy the post!
Tags: cat heavy-duty
Related Posts

How to Get Approval Password for CNH EST Programming
2023.09.1

Jpro Toolbar Perform a Comprehensive Electronic Inspection With Visual PM Inspec...
2024.01.28

Toyota Corolla 2013+ Keyless Go All Keys Lost Programming by Zed-Full
2019.07.31

Operation Steps for Vetronix Tech 2 GM Scanner
2024.01.28

How to Correct Milage for BYD HAN by CGDI CG100X
2024.06.20

How to use gm tech2
2024.01.28

Using a Diagnostic Car Code Reader You Don
2019.02.27

FLY FVDI 2018 ABRITES Commander Reviews
2019.03.8

LCD Instrument Cluster Retrofit Coding by JLR PATHFINDER for Range Rover L494
2023.04.4

Lexus E350 2013 Smart Keys All Key Lost Programming Guide
2019.05.14